A20 Design Works Tender

TPHS were retained by DHB to assist with the co-ordination and technical approvals of the detailed design of the interim improvements to change two roundabouts on the A20 into signalised T junctions as part of the approved works package for the HRO.

Steve Jones led TPHS work on this which included providing the necessary continuation from the outline design approvals to carry forward into the detailed design.

Initially TPHS provided a tender document which the client put out to a selected list of Consultancies. When the Tender returns came back TPHS assisted the client in marking and interviewing the shortlisted consultants. From this we assisted the appointed consultancy with their work to achieve consent for the detailed design drawings. Subsequently TPHS also assisted with the interviews and scoring for a contractor tender process for the package of works.