Port of Dover

Port of Dover

TPHS have been retained by Port of Dover to advise on traffic, transport and highways impacts of projects at the port for the last 3 years. Prior to this Steve Jones, TPHS Director, was Project Director for the strategic Terminal 2 project which through a HRO provided the mechanism to create a second terminal at the Western Docks to provide additional capacity.

The Port has undertaken many projects over the last 3 years and TPHS have provided inputs in terms of detailed highways and transport technical notes, outline design of new infrastructure on the Dover Western Docks Revival (DWDR) project and also the creation of updated and detailed VISSIM models of both the A20 corridor and the T1 port operation.

Details of projects undertaken recently for the Port are:

A20 Design Works Tender

Union Street WIG WAG Assessment

Dock Exit Route Audit

A20 / T1 Vissim Model Development